My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129895
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:30:51 PM
Creation date
11/25/2007 8:20:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996064
IBM Index Class Name
Permit File
Doc Date
9/5/1996
Doc Name
CONSTRUCTION MATERIALS REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Life of the Operation <br />The operation will begin following issuance of the permit. It is anticipated that <br />only about one acre will be mined per year. On the basis of this rate of extraction, the <br />life of the operation is estimated to be about 20 years. <br />Phases of Mininc,Land Reclamation <br />Mining will occur in phases. Each phase will consist of a topsoil stockpile, <br />overburden stockpile, mine pit and product stockpile. Atypical layout is illustrated on <br />the Exhibit C map. However, soil and overburden piles, and equipment, will move <br />around the property as the mining advances. <br />It is anticipated that there will be three phases of the operation as follows: <br />PHASE AREAL ESTIMATED TIME PERIODz <br /> <br />1 5.8 ac. 5-6 yrs. <br />2 5.5 ac. 5-6 yrs. <br />3 9.5 ac. 9-10 vrs. <br /> 20.8 ac. ~ 20 yrs.2 <br />i The permit area is 40.24 acres. However the actual area to be disturbed <br />is only about 23.5 acres. This is 20.8 acres for phases 1-3 (+) about 2.7 <br />acres for the detention pond and other misc. uses. <br />z Estimated on basis of 15,000 tons per year production. <br />Concurrent Reclamation <br />Reclamation will occur in conjunction with the mining operation to the extent <br />practicable. It is planned that no more than five acres will be mined at any one time. A <br />maximum of 10 acres of total disturbance (five acres of pit and the remainder being the <br />detention pond stockpile areas, and other miscellaneous disturbances) will occur at <br />any time before reclamation commences. This is a limitation established by Douglas <br />County for the site and will also be the basis for calculating the financial warranty. <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.