My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129851
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:30:50 PM
Creation date
11/25/2007 8:16:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981016
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Correspondence & Stipulations Related to East Portal M&R Plan Modification
Section_Exhibit Name
APPENDIX X Section X.14
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
page 2 <br /> <br />to our customers. The operation of the Blusher is as follows: <br />The Blusher is a double-drum cable hoist arrangement having <br />both ends attac:^.ed, one to each drum. This allows the cable <br />on one drum to be reeled in while the cable on the other drum <br />is reeled out. The Blusher bucket is then attached to one of <br />the cables and by simultaneous reeling and unreeling of cables - _ <br />pulls the Blusher bucket dawn into the sump. The direction of the <br />C <br />cable is then reversed and the Blusher pulls the bucket back out <br />of the sump, in the process, loads the bucket ~dith fine material. <br />This fine material is then drawn out of the entry and dumped out <br />of the bucket at a location for pick-up and transportation out- <br />side. This process is carried on simultaneously with vrater being <br />pumped into the sump and will nut necessitate draining of the sump. <br />The sump will only have to be drained in order to replace the <br />sheave or the cable in the sump. <br />How much sediment: <br />2.57 acre feet <br />(2.57 acre feet) (43560 ft2/acre) (120 lb/ft3) = (2000 lb/ton) <br />= 6,117 tons in available space <br />at 10 tons per hour expected deposition <br />671.7 hours of deposition <br />671.7 hours = 14 hours/day = 48 days <br />120 lbs. is based on Peiie's S.G. for clayey sand at 1.93 <br />1.93 x 62.4 1b/ft3 = 120.4 1b/ft3 <br />• <br />tv=- .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.