My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M1990016
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1990016
>
_PERMIT FILE - M1990016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2020 10:24:19 AM
Creation date
11/25/2007 8:13:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990016
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT E MAP
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pl-.Jz HIGH PLAINS STONE CO. <br /> _ (A Business Office So.Sales Yard <br /> 5232 Quail St. 13113 So.Hwy.83 <br /> Wheat Rldge,CO 80033 Parker, CO 80134 <br /> 0ME (303) 422-44I 4 (303) 841-3338 <br /> EXHIBIT C - Mining Plan <br /> ' 1 . Dates - Mining will commence as soon as proper permits <br /> are established and will continue as long as stone <br /> ' supply is available , permit is valid , and market trends <br /> support extraction . <br /> 2 . Topsoil - Due to the nature of the rock slide that rock <br /> ' will be extracted from the top soil consideration will <br /> not apply . No soil will need to be removed or relocated <br /> because the rock area is all surface . <br /> ' 3. Because the slide rock is on top no overbudren or waste <br /> rock will need to be removed to reach deposit . <br /> ' 4 . Slide rock will be removed to a maximum of 3 meters , <br /> the deposit ranges from 1 to 30 meters . <br /> ' 5 . Major Components - The major components of our mining <br /> operation will simply involve the parking area for <br /> employee ' s vehicles (not to exceed 4 pickup spaces ) <br /> ' along the existing access road , and a 10 ' X 20 ' area <br /> for a mobile crane . No maintenance building , processing <br /> plant , office or otheir permanent structures will be <br /> ' necessary . <br /> 6 . Disturbances - There will be no significant disturbances <br /> to the land surface . <br /> 1 7 . Roads - An access road already exists to the general <br /> mining area . Three duo four short access points (less <br /> ' than 10 meters each) will be needed to gain access to <br /> the slide areas . Construction or improvements of new <br /> or existing roads will not be necessary . <br /> ' 8 . Water - No water will be needed for extraction purposes . <br /> Drinking water will be provided with bottled water . <br /> ' 9 . Ground Water - Due to no excavation no ground water or <br /> surface water will be encountered . <br /> ' 10 . [dater Rights - No existing water rights will be disturbed , <br /> altered or infringed upon . <br /> ' 11 . Processing - All material disturbed will be extracted . <br /> No on site milling or preparation is necessary . Stone will <br /> simply be extracted , stacked on palletts and removed by <br /> truck via access road . No plant facilities , tailings , <br /> ' heaps or drainage ale erations will be made . <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.