Laserfiche WebLink
• The Topsoil Management Plan for Nucla East, including the proposed <br />topsoil balance, is presented in Tab 21, Minesoil Reconstruction. <br />Proposed topsoil stockpile designations and locations are shown on <br />Exhibit 12-3, Operations Plan - Nucla East and Exhibit 21-3, Topsoil <br />Salvage and Replacement Area. <br />• <br />• <br />vi Revised 04/11/88 <br />