Laserfiche WebLink
~• INTRODUCTION <br />Peabody Coal Company will disturb approximately 134 acres of native <br />soils, topsoiled reclamation areas, and regraded spoils during 1988 at <br />Nucla Mine. Mine-related disturbance will occur in three separate areas <br />as shown on Exhibit 12-2, Operations Plan. Peabody Coal Company will <br />affect about 125.2 acres of pastureland, hayland, rangeland, and <br />associated disturbed land (farmyards, ponds, roads, and residences) <br />during the next two years (1989-1990) within the 234.5 acre Nucla East <br />permit area as shown on Exhibit 12-3, Operations Plan - Nucla East. <br />Peabody Coal Company, in conjunction with the USDA, Soil Conservation <br />Service, Norwood, Colorado, conducted a reconnaissance of Nucla Mine <br />surface soils in 1975. This soils map, originally completed on 1" _ <br />400' aerial photos dated July 22, 1975, was submitted as part of Surface <br />Mine Permit (SMP) 75-36 (see Exhibit C-5, Soils Map, 7-22-75). This <br />initial Order 3 soil survey included the entire Nucla Mine Control Area <br />(Portions of Sections 25, 26, 35, and 36 in T47N, R16W and Sections 30 <br />• and 31 in T47N, R15W). <br />An Order 1-2 soil survey was completed by Claude L. Fly and Associates <br />in May, 1979 for the 116-acre mining tract located predominantly in the <br />SW 1/4 of Section 25, T47N, R16W. This soil survey information, <br />submitted as Tab 9 of SMP C-008-81, included all of Mining Area 1 (see <br />Exhibit 12-2, Operations Plan, and Exhibit 9-1, Soil Types). <br />Two additional Order 1-2 soil surveys were completed for Nucla Mine in <br />1979 and 1980. first, the East Pit soil survey addition, completed by <br />Peabody Coal Company in November, 1979, is located 0.5 miles southeast <br />of the Nucla Mine office in the SW 1/4 NW 1/4 and the NW 1/4 SW 1/4 of <br />Section 31, T47N, R15W. This survey information, presented as <br />Attachment 9-2A to Tab 9, SMP C-008-81, included a portion of Mining <br />Area 3 (see Exhibit 12-2, Operations Plan, and Exhibit 9-1, Soil Types). <br />Second, the Shop Area soil survey addition, completed by Peabody Coal <br />Company in November, 1980, is located in the immediate vicinity of the <br />Nucla Kline office within the E 1/2 SW 1/4 SE 1/4, Section 25 and W 1/2 <br />SE 1/4 SE 1/4 of Section 25, T47N, R16W. This survey information, <br />iv Revised 04/11/88 <br />