Laserfiche WebLink
112(4)(.1) (12) EXHIBIT L - Reclamation Costs (continued) <br />• <br /> If industrial sites are scheduled for the affected <br /> areas at cessation of our operation, the following <br /> costs will be allocated to final reclamation: <br /> The major disturbed areas will receive final grading <br /> by a maintainer leaving a flat and uniform surface: <br /> Grader Time Area A-4 hours ~ $30.00 hr - $120.00 <br /> Grader Time Area B-4 hours ~ $30.00 hr - $120.00 <br /> Grader Time Area C-4 hours ~ $30.00 hr - $120.00 <br /> Grader Time Area D-4 hours ~ $30.00 hr - $120.00 <br /> Grader Time Area E-4 hours ~ $30.00 hr - $120.00 <br /> Grader Time for moderate disturbed areas: <br /> 8 hours ~ $30.00 hr - $240.00 <br />• Banks of shelf areas to be graded to a 4 to 1 slope, <br /> planted to the mixture aforementioned. <br /> Cost of seeding materials and labor to broadcast: <br /> Area A Bank 1/5 Acre $16.00 <br /> Area B Bank 1/5 Acre $16.00 <br /> Area C Bank .12 Acre $ 6.50 <br /> Area D Bank 1/3 Acre $26.00 <br /> Area E Bank 1/2 Acre $40.00 <br /> Moderate disturbed areas 14.7 Acres $1135.00 <br /> or a total cost of $2079.50 <br /> If industrial sites are not scheduled as stated and <br /> we start our seeding program for the complete major <br />_ disturbance areas, there will be an additional cost <br />• of $617.00 to seed the flat areas of the operation. <br />- Page -20- <br />