Laserfiche WebLink
•112(2)(h) e. TIMETABLE <br />1. Area A. Area to take a period of three years to strip for <br />gravel. We plan a timetable of 1977 through 1981 <br />to have this area materials to be used and stock- <br />. piled on the same area. The stripping and crush- <br />ing process will have the final grade clean and <br />surface will be waste sand and gravel from the <br />crushing process. Stockpile will consist of <br />finished products in sizes that are needed in <br />this business. <br />2. Area B. Area to take a period of two years from 1982 <br />through 1983 and the same proceedure will be <br />used as stated in paragraph A. During this period <br />• materials will be removed from stockpile in area <br />A, as needed. <br />3. Area C. Area to take a period of two years from 1984 <br />through 1925 and the same proceedure will be <br />used as stated in paragraph A. During this period <br />materials will be removed from areas A. and B. <br />as business warrants. <br />4. Area D. Area to take a period of two years from 1986 <br />through 1987 and the same proceedure will be <br />used as stated in paragraph A. During this period <br />materials will be removed from areas A., B, and C. <br />as business warrants. <br />5. Area E. Area to be preserved as a possible future gravel <br />• operation area if business warrants. In the event <br />_Page -12- <br />