Laserfiche WebLink
<br />DINING PLAN CONTINUED: <br />LL. THE ROAD BASE MATERIALS WILL BE MINED. OVERSIZED ROCK <br />CRUSHED TO -5~8"~ STOCKPILED AND HAULED TO COUNTY ROAD <br />JOBSITES PERIODICALLY. THE EQUIPMENT TO BE USED WILL BE <br />STANDARD PORTABLE SCREENING AND CRUSHING PLANTS BELLY DUMP <br />AND END DUMP TRUCKS. AND SUPPORTING EXCAVATION EQUIPMENT. <br />THERE WILL BE NO WATER OR CHEMICAL PROCESSING. {~LSDr THERE <br />WILL BE NO ASPHALT OR CONCRETE PLANTS USED. THIS OPERATION <br />IS DESIGNED TO AVOID OFF-SITE DAMAGE OR DISTURBANCE OF THE <br />HYDROLOGIC BALANCE. ~$EE EXHIBITS E-1 THRU E-6) <br />