Laserfiche WebLink
<br />EXHIBIT C - MINING PLAN <br />1. THE ESTIMATED DATE TO BEGIN MINING IS MAY 1992 <br />OPERATIONS ARE EXPECTED TO LAST UNTIL 2002. <br />2. THE DEPTH TO WHICH THE TOPSOIL WILL BE SALVAGEI <br />RANGE FROM S" TO 12". WHERE POSSIBLE, THE OPERATOR 1 <br />REAPPLY TOPSOIL ON A GRADED AREA IMMEDIATELY AFTER <br />DUE TO THE PERIODIC NATURE OF THIS OPERATION THERE 1 <br />TIMES WHEN TOPSOIL WILL BE STORED iN THE DESIGNATED <br />FOR EXTENDED PERIODS OF TIME. IN THIS INSTANCE THE 1 <br />WILL STABILIZE THE TOPSOIL PILES BY SEEDING THEM W!' <br />SEED-MIX FORMULA AND RATE SPECIFIED 1N THE RECLAMAT <br />TOPSOIL STOCKPILES WILL BE LOCATED SEPARATE FRI <br />STOCKPILES AND OUT OF THE WAY OF MINE TRAFFIC AND OI <br />STREAM CHANNELS AND DRAINAGEWAYS. SEE EXHIBIT E-4) <br />3. THERE WILL BE NO ANTICIPATED WASTE ROCK OVERBUI <br />DEAL WITH. <br />4. THE MATERIAL TO BE MINED WILL BE USED FOR ROAD <br />CONSTRUCTION AND REPAIR. THE GRAVEL DEPOSIT AND CLA' <br />MATERIALS WILL BE MIXED WITH THE CRUSHED ROCK AND S' <br />FUTURE USE. THE THICKNESS OF THE DEPOSIT WILL VARY <br />TO 1H FEET. SEE EXHIBIT E-6) <br />S. THE MAJOR COMPONENTS OF THE MINE WILL BE THE P <br />MATERIALS STORAGE AREA, TOPSOIL STORAGE AREA, AND WI <br />STORAGE AREA. SEE EXHIBITS E-4 AND E-S) THERE WILI <br />BUILDINGS OR OTHER STRUCTURES ON THIS PROJECT. <br />6. THE EXPECTED PIT EXCAVATION WILL BE ROUGHLY S i <br />OTHER DISTURBANCES WILL BE MATERIALS AND TOPSOIL STI <br />AREAS AS SHOWN IN EXHIBIT E-4. <br />~. THE EXISTING ACCESS iS COUNTY ROAD #14. No <br />SPECIFICATIONS ARE NECESSARY FOR LOCAL MINING ROADS <br />THAT IF THE LESSOR WANTS ANY OF THE MINING ROADS TO <br />FOR POST-MINIG RANCH MANAGEMENT PURPOSES, THE COUNT' <br />GRADE, DRAIN AND DEVELOP WATER BARS ON THEM TO PREVI <br />EROSION. <br />H. NO WATER WILL BE USED IN THIS OPERATION. <br />9. THE MINING OPERATION WILL NOT INTERCEPT GROUND <br />NO SIGNIFICANT EPHEMERAL DRAINAGES WILL BE DISTURBEI <br />STORM WATER WILL BE MITIGATED BY DIRECTING IT TO L01 <br />FOR ABSORPTION AND EVAPORATION WHERE POSSIBLE. THE <br />WILL BE GRADED TO 3.1 ~HORIZ TO VERT) OR FLATTER. TI <br />BE NO DEWATERING OR CHEMICAL TREATMENT INVOLVED IN <br />OPERATION. <br />LO NO WATER RIGHTS WILL BE ACQUIRED. THERE WILL BI <br />INJURY TO EXISTING WATER RIGHTS. <br />WILL <br />'ILL <br />SALVAGE. <br />'ILL BE <br />AREAS <br />iPERATOR <br />H THE <br />ON PLAN. <br />~M OTHER <br />iT OF <br />IDEN TO <br />BASE <br />ORED FOR <br />FROM O <br />T, <br />i0D FUEL <br />BE NO <br />ACRES. <br />iRAGE <br />EXCEPT <br />REMAIN <br />WILL <br />NT SOIL <br />WATER. <br />~. LOCAL <br />I POTNTS <br />'LOPES <br />IERE WILL <br />'HIS <br />NO <br />