My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129577
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129577
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:30:35 PM
Creation date
11/25/2007 7:53:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/22/2006
Section_Exhibit Name
Exhibit 13 Appendix A to E
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />• <br />Table D-1a. Purchase Price, Lease Cost, and Operating Costs for 58 CY Electric Shovel <br />and 793C Trucks <br />Operators that use the truck/shovel appendix must show a regrading plan that is suitable <br />for a large shovel/truck operation. Many backfill operations are not suited for this type <br />operation because the cuts are not thick enough to allow the shovel optimum digging <br />depths, highwall reduction with dozers takes up a large percentage of the required backfill, <br />and there is insufficient backfill to justify this large shovel/truck fleet. <br />Operators using the shovel/truck appendix should submit suitable cut and fill isopachs that <br />support the choice of this backfill method. <br />This method is not to be used for topsoil movement from native areas or from stockpiles. <br />The $11,290,000.00 purchase price of the 58 CY shovel must be added to the bond costs. <br />There is no profit or other contingency items added to this cost so it can be added to the <br />bond cost after all the line items and add-ons have been totaled. No salvage value is <br />allowed at the end of the project. <br />58 CY Electric Shovel <br />Purchase Price $11,290,000.00 (WME) <br />Productivity - 58 CY x 1 pass/35 sec. x 3,600 sec./hr, x 0.968 bucket fill factor = 5,774 <br />CY/hr. <br />5,774 CY/hr. x 0.8696 BCY/LCY (15% swell of BCY) = 5,021 BCY/hr. <br />5,021 BCY/hr. x 0.8333 (operating efficiency) = 4,184 BCY/hr. <br />Hourly Costs (WME) <br />Overhaul <br />Parts Overhaul <br />Labor Maint. <br />Parts Maint. <br />Labor <br />Power <br />Lube Wear <br />Parts <br />Total <br />$31.62 $29.37 $47.44 $44.05 $81.22 $32.26 $16.89 $282.84 <br />Caterpillar 793C Trucks (240 Ton) <br />Purchase Price $2,422,000.00 (WME) <br />Monthly Lease (@600 hr./month) <br />Hourly Lease Cost <br />$54,000.00 <br />$90.00 <br />Hourly Costs (WME) <br />u <br />Overhaul <br />Parts Overhaul <br />Labor Maint. <br />Parts Maint. <br />Labor <br />Fuel <br />Lube <br />Tires <br />Total <br />$7.69 $6.12 $14.28 $11.37 $67.85 $17.65 $63.95 $188.91 <br />DE 10/2005 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.