My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129577
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129577
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:30:35 PM
Creation date
11/25/2007 7:53:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
3/22/2006
Section_Exhibit Name
Exhibit 13 Appendix A to E
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Table D-2. Abbreviations Used in This Standardized Bond Format <br /> <br />CPH - Caterpillar Performance Handbook (Edition No. specified where <br />appropriate) <br />DOCRG - Dataquest Cost Reference Guide (date of data indicated) <br />WYDOT-WDD - Wyoming Department of Transportation - Wage Determination <br />Decision (2005 Version) <br />WME - Western Mine Engineering, Inc. (2005 Estimating Guide) <br />BCY - Bank Cubic Yard <br />LCY - Loose Cubic Yard <br />MPH - Miles Per Hour <br />BHB - Black Hills Bentonite Corporation <br />AML - DEO Abandoned Mine Land Reclamation Program <br />II. STANDARDIZED RECLAMATION BOND FORMAT <br />Individual items may be expanded as necessary or noted as not applicable based upon <br />the specific reclamation practices approved in each permit. <br />• A. Area Bond <br />The Area Bond covers the costs of backfilling and rough grading (and special <br />reconstruction techniques when specifically approved) according to procedures and <br />postmining topography approved in the current term permit. <br />Introduction <br />Present a general discussion of assumptions, calculations, procedures, methods, <br />etc. for summarizing or documenting calculations. <br />2. Backfill <br />Describe equipment, procedures, volumes, and costs for bringing all pits to an <br />interim/bond topography with reference to a quality, current map of the project site. <br />The interim/bond tooooraahy must come as close as aossible to the <br />Appendices A through F detail equipment fleets and costs for this reclamation <br />activity. <br />Operators should clearly show cut and fill areas and the associated haul distances <br />• and grades on a map. <br />DE 10/2005 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.