Laserfiche WebLink
<br /> <br />-z- <br />As material is mined, it is fed to a.crusher for processing <br />to the desired size and then stockpi} in the pit area for use as <br />;.,., <br />needed. The crusher and stockpile area will move throughout the pit <br />as required to remain adjacent to the excavation operation. Handling <br />and stockpiling will be done with a combination of dozers, front- <br />end loaders, trucks, and conveyors. <br />The material is removed from the pit area using trucks and a <br />loader. Access to the county road is an existing paved road <br />belonging to Nielsons and is part of their office - shop complex <br />just south of the pit area. The scales shown on the general map <br />are used in this removal process and are the only piece of equipment <br />which is constantly at the site. <br />At present market demands for this product, the mining at <br />this pit is expected to continue for the next ten to fifteen years. <br /> <br />