Laserfiche WebLink
~~ <br />y. No individual shall be employed as a laborer or mechanic <br />on this contract except on a wage basis, but this shall not be <br />comtrued to prohibit the rental d trams, trucks, or other equip <br />meat from individuals <br />YI. RECORD OF MATERIALS, SUPPLIES AND 1A6OR <br />1. The provisions in this section are applicable to all contracts <br />axcept contracts for secondary highways and contract; financed <br />solely with funds provided by the Highway Beautification Act of <br />1965, as amended. <br />2. The contractor shall maintain a record of the total cost of all <br />materiale and supplies purchased for and incorpnrmed in the work, <br />end also of the quantities of those specific materials and supplies <br />listed on Form PR--07 end in the units shown. Upon completion <br />of the contract, this record, together with the final tabor summary <br />required in Section Y, paragraph 3, hereof, shalt be transmitted to <br />the Starr highway department resident engineer tar the project nn <br />Form PR-47 in accordance with instructions attached thereto. <br />which will be furnished for this purpose upon request. The quan• <br />tines for the listed items shall be reported separately for roadway <br />and for structures over 20 feet tong as measured along the centeo- <br />line of the roadway. <br />3. The contractor shell become familiar with the list o! specific <br />materiale end eupplies contained in Form PR-47 prior to the rom- <br />meneement of work under this contract. Any additional materials <br />information requited will be eolicited through revisioro of Form <br />PR-47 with attendant explanations. <br />4 Where subcontractors are involved the contractor shall submit <br />eitber a single report covering work Loth by himsel[ and all his <br />eubeonersetore, or he may submit separate reporle for himself and <br />far each of hie subcontractors. <br />VII. SUBLETTING OR ASSIGNING THE CONTRACT <br />1. The contractor shell perform with hie own organization con• <br />Batt work amounting to not leas than 50 percent of the original <br />total contract price, except that any items designated by the <br />State ea "Specialty Items" may he performed by subconvnct and <br />the amount of any each "Specialty Items" so performed may be <br />deducted from the originol total contract price before computing <br />the amount o! work required to be performed by the contractor <br />with hie own orgeairrztioa <br />a "Hie own organization" shall be construed to include only <br />workmen employed and pa[d directly by the prime contractor and <br />equipment owner ar rented by him, with or without operators. <br />b. "Specialty Items" shall be construed to be limited to work <br />that requires higbly specialized knowledge, craftsmanship or <br />equipment not ordinarily evailoble in contracting organization. <br />qualified. to bid on the contract as a whole end in general arc to <br />be limited to minor components of the overall, contract. <br />2. In addition to the 50 percent requirement set forth in pnra- <br />grnph 1 above, the cnatractor shall furnish (a) a competent super <br />intendant or foreman who is employed by him, who has full au• <br />charity to direct performance of the work in accordance with the <br />contract requirements, and who is in charge of all construction <br />operations (regardless of who performs the workl, and (b) sucfi <br />other of his own organisational capability and responsibility (su• <br />perviaion, management, and engineering ~ serviml as the Swte <br />highway department contracting oRxer determines is necessary to <br />assure the performance of the contract, <br />3. The controct amount upon which the SO percent requirement <br />set forth in paragraph 1 is computed includes the cost of materials <br />end manufactured products which are to be purchased or produced <br />by the contractor under the contract provisions <br />4. Any Items that have been selected as "Specialty hrm~' for <br />the contrart an listed as such in the Special Provisions, bid <br />:ochcdule, or elsewhere in the contract documents. <br />5. No portion of the contract shell be sublet, assigned or other <br />wise disposed of except with the written consent of the State high• <br /> <br />way department rontrauing officer, or his muhorized represrnta• <br />tire, and such consent when given shall not be construed to <br />relieve the contractor of anq respon,ibility far the hdfillment of <br />the contract. Request for Permission to -abler, assign, or other <br />wise dispose of any portion of the contract shall be in writing <br />and accompanied Ly (a) a showing that the organization which <br />will perform the work is particularly ezperienced and equipped <br />Sor such work, and (by an assurance by the contractor that ihr, <br />labor standards prmisions set forth in this contrart shall apply <br />[o labor perfot mad on all wmk encempaseed.by the request. <br />VNI. SAFETY; ACCIDENT PREVENTION <br />In the performance of this contract. the wnlractor shall comply <br />with all applioabl< Fede: al, State and local Inws governing safety, <br />health and sanitation. Thr, contractor shall provide all safeguards, <br />safety devices and protertivc equipment and take any other needed <br />actions, on his own responsibility, or a. the State highway deperF <br />meat contracting officer may determine, reasonably necessary to <br />protect the life end heeltb c( employees on the job and the safety <br />of the public and to protect property in connection with the per <br />formance o! the work covered by the wntrnut. <br />It is a condition of this contract, and shall be made a condition <br />of each sttbuontract entered into pursuant to this contract, <br />that the contractor end any subcontractor shell not require any <br />laborer or mechanic employed in performance of the contract to <br />work in surroundings nr under working conditions which are um <br />eanitery, harardous, ur dangerous to his health or safety, as deter <br />mined under construction safety and health etandarda (Title 29, <br />Code of Fcdera! Regulations, Pen 1926, formerly Part 1518, ee <br />revised from time to timel, promulgated by the United States <br />Secretary of Labor, in accordance with Section 107 of the Cora <br />tract Wark Hours and Safety Smndards Act (93 Stat. 96). <br />{X. FALSE STATEMENTS CONCERNING HIGHVIAY <br />PROJECTS <br />In Hider to as+ttre high quality and dure6le construction in eon• <br />Inrmily with approved plans and sperifiratiens and a high degree <br />of reliability an stutemenb and representations made Ly engineers, <br />contractors, supplies, and workers on Fedarahaid highway project6 <br />it is essential that al! persons concerned with the project perform <br />their functions as carefully, thoroughly, and horteatly as poseibla <br />Willful falsification,~diatortion, or misrepresentation with respect <br />to any facto related to the project it a violation of Federal law. <br />To prevent any misunderetandittg regarding the seriouanesa o{ <br />theca and similar acts, the following notice shall be posted an <br />each Federa4aid highway project in one or more places where it <br />is readily avafleble to all personnel concerned with the project:' <br />•' r <br />NOTICE TO ALL PERSANNEL ENGAGED ON <br />FEDERAL-AID HIGHWAY PROJECTS <br />Title 18, United Staten Code, Section 1020, reads as follows: <br />"Whoever, bring an officer, agent, or employee of the United <br />States, or of any Starr. or, Territory, or wlwerer, whether a person, <br />association, firm, or empm orlon, knowingly makes any false etatr~ <br />meat, false rcpresemation, or false report as to the character, <br />quality, quomity, or cost of the material used or to be uxd, or the <br />quantity or quality of the work performed or to he performed, or <br />the casts thereof in ennnection with the submission of plans, maps, <br />specifications, contracts, or costs of construction on any highway <br />or related project submitted for approval to the Secretary of <br />Transportation; or . <br />"Whoever knowingly makes any false ,tatement, false represem <br />cation, false report, or false claim with respect to the character, <br />quality, quantity, or cost of any work performed or to be per <br />formed, or materials furnished or to be furnished, in connection <br />with the construction of any highway or related project approved <br />.by the Secretary of Transporation; or <br />"Whoever knowingly makes any false statement or false raper <br />senration as to a material fact ir, any statement, certificate, or <br />Form PR-1273 {Rav. 4-751 Page 5 <br />