My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129087
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:26:10 PM
Creation date
11/25/2007 7:04:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001017
IBM Index Class Name
Permit File
Doc Date
7/13/2001
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 07/12/2001 <br />User : GRS <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado PerrniUjob# : M2001 017 <br />County :Weld Abbreviation :none <br />Site :Lohmann S&G Filename MOf7-001 <br />Agency or organization name : CO. DMG <br />Permit or other job action :New Appl <br />Task description : Backfill 3:1 pond slope <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U <br />Blade type :Universal <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume: 450,000 LCY <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 : NA <br />Ownership cost/hour : $43.30 <br />Operating cost hour : $66.26 <br />Ripper op. cost hour : $0.00 <br />Operator cosUhour: $27.99 <br />Total unit cosUhour : $137.56 <br />Swell <br />factor : NA <br />Source of estimated volume :Table L <br />Source of estimated swell tailor : NA <br />HOURLY PRODUCTION <br />Average push distance : 150 feel <br />Unadjusted hourly production : 685.7 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % (neg) <br />Average site altitude : 4,800 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Basalt <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.472 /LCY <br /> Horsepower: 305 <br /> Shift basis : 1 per day <br /> Data source : (CRG) <br />Utilization <br />NA <br />100 <br />NA <br />NA <br />Total fleet cost hour : $137.56 <br />Loose <br />volume : 450,000 LCY <br />Job Condition Correction Factors <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br /> Source <br />0.75 (avg.) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1shiWday) <br />0.80 (fnd-rn <br />1.22 (Cat HB) <br />1.00 (Cat HB) <br />0.70 (Cat HB) <br />1.00 (S/SU/U) <br />291.55 LCY/hr <br />291.55 LCY/hr <br />1543.47 Hours <br />$212,313 <br />
The URL can be used to link to this page
Your browser does not support the video tag.