Laserfiche WebLink
4...~.._._. <br />' • • <br />1 <br />It is difficult to make time projections for the reclamation <br />1 of this site because it is totally dependent upon the mining <br />schedule. However, all planning has been based on a 15-20 year <br />' time span, Since the mining operation will be contingent, to a <br />large part, on the demand for gravel in the area, it xould be <br />nearly impossible to assign a precise timetable to the reclamation <br />' phase. <br />It should be noted, however, that D & F ENTERPRISES has <br />' every intention of beginning reclamation measures as soon as <br />possible after mining operations have been completed in a given <br />' sector, as outlined, After a final grade has been established in <br />' an area, that area xill be re-vegetated according to the enclosed <br />recommendations of the USDA. The planting schedule xill also take <br />into account the best times of year for such work and current <br />climatic conditions affecting groxth of vegetation. <br />~ , <br /> <br /> <br />1 <br /> <br />1 <br />