Laserfiche WebLink
Phase IV Weekly Summary No. 28 Page 3 <br />(See Attachment B for nuclear moisture density testing summary.) <br />I~ <br /> <br />Laboratory Test Results <br />003-2203 <br />Golder observed confirmation drilling of underground workings in the Phase IVc azea (full time). <br />Golder did not conduct any new laboratory testing for the Phase IV construction azea during this <br />reporting period. <br />Meetin¢s <br />CC&V held a Weekly Contractor meeting on August 14a`. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on August 2151, 2001 at <br />10:00 AM. <br />Golder Personnel On-Site <br /> <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />Phase Na 28 Aug12-Ig.doc <br />Golder Associates Inc. <br /> <br />