My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129033
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:26:07 PM
Creation date
11/25/2007 7:01:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 26
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IV Week]y Summary No. 27 Page 2 <br />003-2203 <br />Slope recontouring in the Phase Na area included blasting east of the existing HWY 67, at <br />Permanent Diversion Channel stations 34+00 through 40+00 on August 6e' through 8u', 10`s, and <br />lla'. <br />Ames continued clearing and grubbing in the Phase Na area at the Bateman Creek Pond <br />construction azea. Ames removed all available topsoil and placed it in Visual Barrier topsoil <br />stockpile. <br />Phase IVb <br />Ames continued placement and compaction efforts of SF, west of the active crusher, for the new <br />LOB construction. Ames placed SF in approximately 2-foot lifts, removed oversized and deleterious <br />material (roots), moisture conditioned, and compacted the fill that was borrowed from the Phase IVa <br />slope excavation and Phase Nb local borrow. Compaction was attained by use of a smooth drum <br />vibratory compactor. ~ ~ <br />No confirmation drilling or underground working remediation occurred within the Phase IVb azea <br />during this reporting period. <br />PhaseIVc <br />Ames began slope recontouring within the Phase IVc azea by removing cut material and placing it in <br />the Phase IVb fill. <br />Ames conducted confirmation drilling at UG-236, UG-244, and UG-246b. Ames confirmed an <br />underground working located at UG-244 and conducted blast drilling and blasting on August 9a'. <br />(See Attachment A for approximate construction locations for all Phase IV azeas.) <br />Field Monitoring and Testing Activities <br />Golder observed clearing and grubbing activities in Upper Arequa Gulch (Phase IVa). Clearing and <br />grubbing activities were conducted within the clearing limits. <br />Golder monitored SF placement in the Phase N area including, verification of lift thickness, <br />material, compactive effort, particle size, and temperature for compliance with the drawings and <br />method specifications. No moisture/density tests were performed on SF during this reporting period, <br />as material was un-testable per ASTM D698, based on laboratory testing and visual determination. <br />Golder observed the removal of oversized and deleterious material from the fill. <br />Golder observed confirmation drilling and underground working excavation in Phase IVc (full time). <br />Golder observed confirmation drilling at UG-236, UG-244, and UG-246b and blasting at UG-244. <br />Laboratory Test Results <br />Golder did not conduct any laboratory testing during this reporting period. <br />PM1aze rVa 2] AugS-I I doc Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.