Laserfiche WebLink
r~ <br />L_.J <br /> <br />Phase IV Weekly Summary No. 36 Page 3 <br />003-2203 <br />Golder observed confirmation drilling and excavation activities associated with the Phase IV <br />construction. Full time monitoring was required of remediation activities of underground workings. <br />Laboratory Test Results <br />No samples were collected or transported to the field laboratory during this reporting period. Results <br />of Structural Fill sample SFa-08 aze presented in Attachment B. <br />Meetines <br />CC&V held a Weekly Contractor meeting on October 10~'. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on October 16`x, 2001 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />Phue IVe 360a09-Oa13 doc <br />Golder Associates Inc. <br />