My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129033
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:26:07 PM
Creation date
11/25/2007 7:01:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 26
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - Associ~2-tes <br />September 25"', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 33: September 16 through September 22, 2001 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na, b, and c <br />Construction Quality Assurance (CQA) services performed for the Cresson Project during the period of <br />September 16s' through September 22"d, 2001. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 33° F to 44° F, with highs ranging from 56° F to 74° F. Rain was recorded on September <br />17`". Weather observations were made on all seven days of this seven-day reporting period. <br />Construction Svnopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase Na, b, and c construction activities on five days of <br />this seven-day reporting period (September 17~' through September 21st) <br />Phase IVa <br />Ames performed Structural Fill (SF) placement activities in the central portion of the Phase IVa <br />footprint, above the newly constructed secondary underdrain. Three Caterpillaz DI0's, two <br />Caterpillar D8's, and a Caterpillaz D7 worked a local borrow of SF to the north, cut to fill <br />construction. A Caterpillar 563C roller provided compactive effort, while a Caterpillaz water wagon <br />provided moisture conditioning when needed or required. <br />Phase IVb <br />Polyflex continued deployment and welding of geomembrane in the Phase IV LOB area and <br />completed geomembrane activities on September 21S`. Polyflex deployed approximately 115,948 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.