My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128690
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:48 PM
Creation date
11/25/2007 6:30:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994093
IBM Index Class Name
Permit File
Doc Date
2/9/1995
Doc Name
DAHLIA NORTH RES PIT FN M-94-093
From
ADCO CONSULTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT D (CONTINUED) <br />(Revised 02/07/95) <br />To summarize, the Mining Areas are as follows: <br />Area 1 - 5 Acres <br />Area 2A - 50 Acres <br />Area 2B - 91 Acres <br />Area 2C - ~ Acres <br /> Total 180± Acres <br />A summary of how each area will be mined is as follows: <br />Area 1 - This area will be wet mined, and backfilled with sand <br />spoils from this area and other mining areas of the <br />property. There will be no import of material for <br />backfilling from out of the permit area. Approximately <br />8,000 cubic yards of topsoil/overburden will be stored <br />and temporarily revegetated in the 25' setback area along <br />the east side of this area and the south side of Area 2B <br />for later permanent revegetation. No mining into the <br />water table will be undertaken, until a temporary <br />augmentation plan has been approved. <br />Area 2A - The South Platte River channel improvements and slurry <br />wall will be installed in the areas shown on the <br />accompanying map after the relevant approvals are <br />obtained. The present plan calls for removal of the <br />existing berm along the southern portion of this area, <br />installation of two riprap trenches, and installation of <br />a grade control structure. The slurry wall along the <br />River will be installed behind (east and south) of the <br />riprap trenches and grade control structures. The exact <br />location and alignment of these improvements are <br />conceptually shown on the MINING PLAN MAP, EXHIBIT C-2, <br />but will be exactly determined by final engineering and <br />approval of UD&FCD. No mining will occur in this area, <br />until UD&FCD and any other relevant approvals are <br />obtained, and after approvals has been obtained, no <br />mining will occur north and west of the riprap trenches. <br />Area 2B - Approximately 8,000 cubic yards of topsoil/overburden <br />will be stored and temporarily revegetated in the 25' <br />setback area with the stored material from Area 1. This <br />topsoil/overburden storage will remain until the end of <br />mining to act as a permanent reserve for revegetation. <br />However, as much as possible, topsoil/overburden will be <br />immediately used in previously mined areas to build the <br />required slopes of the reservoir and for revegetation of <br />the banks/periphery areas. Topsoil/overburden may also <br />be temporarily stored on the future bean along the South <br />Platte River outside of the South Platte River floodway, <br />and/or in other 25' periphery setback areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.