My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128690
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:48 PM
Creation date
11/25/2007 6:30:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994093
IBM Index Class Name
Permit File
Doc Date
2/9/1995
Doc Name
DAHLIA NORTH RES PIT FN M-94-093
From
ADCO CONSULTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT D (CONTINUED) <br />(Revised 02/07/95) <br />The excavation will proceed from south to north and east to west in <br />the phases as shown on the accompanying MINING PLAN MAP, EXHIBIT C- <br />2. Except for installation of the slurry wall, no excavation shall <br />occur within 25' from adjacent property lines. <br />Some areas, as is explained in the next paragraph, will have <br />special setback requirements for any excavation. Except for those <br />areas mentioned in the next paragraph, mining from the minimum 25' <br />setback requirement may be undertaken vertically. After mining for <br />reclamation, all slopes shall be no steeper than a ratio of 3:1 <br />slope. <br />Special setback, sloping, and mining requirements shall apply in <br />following areas: <br />1. Along Monaco Street and 88th Avenue, and within 200' of any <br />adjacent man made structure, no vertical mining will be <br />allowed from the 25' setback line. A temporary 1:1 mining <br />slope shall be allowed, provided any slope within 200' of the <br />man made structure is immediately backfilled to the previously <br />mentioned above standard after mining has been completed in <br />these areas. <br />2. Along the Wyco pipeline, no mining shall occur closer than 50' <br />on either side of the centerline of the pipeline. Even <br />temporary sloping shall not be steeper than 3:1. <br />3. From the center of the Bull Seep Ditch, no excavation shall <br />occur closer than 50' on either side of centerline of the <br />Ditch. Even temporary sloping shall not be steeper than 3:1. <br />4. All mining, including sloping, final elevations, improvements, <br />etc. within the "Area 2A - South Platte River & Berns Area" <br />shall be subject to approval of the UD&FCD. Improvements in <br />the channel area will be installed prior to any mining <br />occurring within this area, no mining shall occur north and <br />west of the eventual location of the riprap trenches. <br />Prior to beginning extraction, 6' chain link fencing will be <br />installed where necessary to prevent access to the site. Where <br />natural barriers, such as the South Platte River exist, no fencing <br />will be installed. In areas where adjacent property owners have <br />installed fencing, Cooley's fence will simply connect to the <br />existing fencing. Two gates will be installed, one onto 88th Avenue <br />and one onto Monaco Street at the proposed Truck Access Points. <br />Both are shown on MINING PLAN MAP, EXHIBIT C-2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.