Laserfiche WebLink
,~ • ovt, ~ Cs) C b~ <br />RECLAMATION COST SlW1ARY con['d <br />• K. PORTAL/SHAFT SEALING <br />Tesk No.l Tesk Description <br />sheet 4 of 4 <br />Cos[ (f) <br />L. DRILL NOLE/MONITOR IMG 1JELL SEALING <br />Tesk No.~ Task Description <br />-~- I ~- <br />Subtotal (K): <br />Cost (f) <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Demolition <br />3 ~ Seedirp <br />fencirq <br />3 ~ Mob/Dennb <br />Subtotal (L): <br />Cost (f) <br />f1,537 <br />f25B <br />• Subtotal (M): f1, 795 <br />TOTAL DIRECT RECLNUTION COSTS (cubtotals A through M): f10, 741 <br />11. INDIRECT COSTS <br />A. CONTRACTOR'S OVERNEAD L 9ROFIT <br />Itm No.~ Item Description ~ Cost (f) <br />1. ~ Public Llabi lity Insurarce.... 7.550% of dlr. ~ fT66 <br />2. ~ Lontreetor'a Perfomm~ce Band 0.97iX of dir. ~ f105 <br />3. ~ Cantrxtor's Profit........... 70.00% of dir. ~ f[,074 <br />4. ~ Jab Super(nterdent.. ~ f944 <br />Subtotal (A): f2,290 <br />TOTAL CONSTRUCT ION COIITRACT AMOUNT (dl rect plus 0 L P): f13,031= <br />B. DMG PROJECT ADMINISTRATION EI(PEMSES <br />Itm Mo.l Itm Deccri ption ~ Cost (f) <br />1. ~ Protect englneerlrg fees at... TO.OOX of rnt r.~ f[,303 <br />2. ~ Statf admin. expense 7.10% of cn[r.~ f925 <br />MEi 1ND 1RECi COST PERCENTAGE: 42.06% Subtotal (B): (2,228 <br />TOTAL INDIRECT RECLAMATIpI COSTS (subtotals A through B): f4,518 <br />- ~u~c= _~ <br />• TOTAL PER FORIIANCE BOND AMOUNT (direct plus Irdlrect costs): fT5,260 <br />Revised for permit renewal I1/I 7/95 -- -___ <br />-7 <br />