Laserfiche WebLink
3.'oa, l Cs~ Cb~ <br />RECLAJVIT ION COST SUIWARY cmt•d sheet 3 of < <br />• H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />___-___ I _________________~__._______~__________ ~ ____,~____ <br />fibtotel (X>: <br />I. EARTHWORK -DRAINAGE CDNTROL SYSTEM IMSTALLAT (ON/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />_____I_ ~_.._...______ I____~___ <br />1 ~ Regrade Sediment Collation Ditch ~ f51 <br />• <br />Subtotal (I): f51 <br />J. EARTHWORK - TOPSOtI/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (f) <br />4 ~ Redi ctribute Topsoil on 7.1 acres of di sturbarce ~ f7, 186 <br />• Subtotal (J): Cer f7, 186 <br />6i6Ciy <br />Revised for permit renewal 11/17/95 <br />-6- <br />