Laserfiche WebLink
• 3.02.1(Sa(!t) Bood Requirements (continued) <br />Update for December 1995 Renewal <br />The original bond of $62,000 was reduced in 1994 due to a Phase 1 release of $31,000. <br />As of the end of 1995, the current bond is $31,000 through Corporate Surety No. <br />124169933. <br />The Division has re-calculated the remaining costs for reclamation at the mine in <br />October of 1995. This cost estimate totaled to $15,260. Since this cost does include the <br />cost of removing the sediment pond and since the actual bond held is much higher due <br />to the mine closing before full disturbance was realized, Rimrock may seek a bond <br />reduction during the next permit term. <br />The updated Division reclamation cost calculations are included in Exhibit SS. <br /> <br />-3- <br />• Revised for permit renewal 11/17/95 <br />