Laserfiche WebLink
<br />4. The road will remain after reclamation. <br />5. Exhibit E. map. <br />6, cost of reclaim is $1400.00 on 3 acres. (20 hours, 2 <br />machines at $10.00 per hour.) <br />Minin~_Plan Map <br />1. Look at Exhibit A map. <br />2. Fabian Vasquez. <br />3. Exhibit A map. <br />4. Director of Extract east to west. <br />5. No structures within 200 feet of operation. <br />6. Exhibit E map. <br />Reclamation Plan Map <br />1. Exhibit E map. <br />2. Exhibit E map. <br />3. No diversions <br />Reclamation plan map continued <br />i 4. 5 - l0~feet <br />5. 8 - 12 inches <br />Exhibit F <br />1. Mine Safety and Health Administration. <br />P•.xhibit G <br />1. Owner (Deed) <br />Exhibit I proof of filing with country clerk <br />E - J Proof of mailing notices of permit AP certified letter. <br />