Laserfiche WebLink
~ ! <br />Answers to Questions B through J <br />Exhibit B. Site Description <br />1. Wild Grass, Pine Trees <br />2. No structures with in 200 feet of affected area <br />3. No water resources near area <br />Exhibit C. Mining Plan <br />1. April through October. <br />2. Soil will be salvaged from around area of operakion and <br /> reclamation process. <br />3. None open quarry, no overburden stockpile Exhibit E map. <br />4. 1/4 inch to 12 inches. <br />5. South West to North section to location. <br />6. ~ 5 acres (110.2). <br />7. ExitincJ road is about 100 feet long and 15 feet wide. <br />8. No water will be used. <br />4. No water will be used reference page 7. <br />10. Notify the CIV Colorado Health & Safety. OSI]A. <br />11. Read the MSDS Material Safety, Data Sheet Ad Notify OSHA. <br />12. Stay with end houndaries. <br />13. No processing on-site. <br />Facilities <br />1. None. <br />Tailinyand Hems <br />1. No impact to ground and surface water. <br />Drainage control <br />1. The water and drainage will automatically run down hill due <br />to the down hill slope. <br />Exhibit D. Reclamation Plan <br />1. Depths, 2 to 5 feet. <br />2. The slop of reclaim i5 less than 3:1. <br />3. It will be seated contact soil cons. service. <br />A through F <br />Soil from mountain will be used to fill reclimation. <br />Wild grass and shrubs will be planted from seeds in the soil <br />already on the land. The soil has been proven to have the <br />needed seeds by reclamation that has already taken place in <br />the area. <br />»: <br />