My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128600
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:43 PM
Creation date
11/25/2007 6:22:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
VOLUME 2 MINE PLANNING APPENDIX - ROOF CONTROL PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAFETY PRECAUTIONS FOR FULL ROOF BOLTING <br />A full roof bolting plan shall be construed to mean bolting as the primary means <br />of roof support. <br />1. Roof bolts shall be installed in the sequence and manner shown in the ac- <br />companying drawings. <br />2. All roof bolts used as the primary means of roof support will be of the <br />resin anchorage type or point anchor resin anchorage. <br />3. a) All personnel required [o install roof supports shall be trained by <br />a qualified supervisor or experienced operator before being made <br />solely responsible for such work. Tnis training shall ensure that <br />such persons are familiar with the functions of the support being <br />used, proper installation procedures, and the approved Roof Control <br />Plan. A record of [his training shall be kept a[ the mine. <br />b) Supervisors in charge and miners who install supports shall be in- <br />formed of an approved Roof Control Plan and any changes that are <br />more stringent than in a previously approved Roof Control Plan not <br />later than their first working shift following receipt of [he ap- <br />proved Plan. As soon as possible, but no later than three weeks af- <br />ter receipt of this approved Plan, all provisions contained herein <br />shall be fully explained [o all miners whose duties requite them to <br />be on a "working section." All new miners shall have the hazards of <br />mine roof and ribs and the content of this Plan explained to them <br />before [hey start to w rk. <br />4. An emergency supply of suitable roof support material including temporary <br />supports sufficient to support the roof during one complete cycle of min- <br />ing, will be provided as close as practical to the working places and/or <br />can be delivered to the working place within thirty minutes. <br />5. To enable miners to perform their duties from a safe position without ex- <br />posure to falling material, a bar of suitable length and design shall be <br />provided on ell mobile face equipment, except haulage equipment. <br />Page Six <br />Initial 11/01/86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.