Laserfiche WebLink
_ .6+3+2.20+.85 <br /> = 6.65 minutes <br /> Use a 50 minute cork hour <br /> 50 min/hr = 7.7 cyc/hr <br /> 6.5 min cyc i <br /> 7.7 cyc/hr x 40 LCY/cyc = 308 LGY/hr <br /> Hours mrniired to move material <br /> 223,000 yd3 = 724 knots <br /> 308 LCY/hr <br /> Cost of truck <br /> $39/hr - equipm~.nt j <br /> $10/hr - labor <br /> 49 <br /> Cost of iroving material <br /> $49/hr x 724 hours = $35,476 <br />• Loader costs <br /> Cycle time = base + materials + pile + ownership + operation <br /> _ .4 + .04 + .02 + (.204) + (-.04) <br /> Use a 50 minute Cork hour <br /> 50 min/hr = 132 cyc/hr <br /> .38 min ~ <br /> 132 cyc/hr x 6 yd3/cyc = 792 yd3/hr <br /> 223,000 3. = 282 hr <br /> 792 yd <br /> IDader costs <br /> $56/hr - equipment <br /> $10/hr - labor <br /> 66 <br /> $66/hr x 282 hours = $18,612 <br /> Zbtal crost to move fill material <br />• <br /> Truck costs - $35,476 <br /> Loader Costs - 18,612 <br />$53,088 <br />VIII-2 <br />