Laserfiche WebLink
<br />~~ ViII <br />iiiiiiiiiiiuiiiiii <br />999 <br />Doc Date:12/11/2001 <br />TION 0067.5 <br />The following costs aze based on the "worst case" condition for <br />another party to go in and reclaim the land. It will be a combination <br />of open cuts and old reclamation work yet to be performed. <br />Faference Used: <br />Caterpillar Performance Harxlbook - Edition 11 <br />la?ntal Rate Bluebook for Construction D3uipment; <br />published by ~n 'pment Chide Book Company. <br />Section 22: <br />Use cut 15 of pit 2 <br />material requited to backfill pit - 223,000 yd3 <br />source - 08 stockpile #6 (223,000 yd3) <br />acreage - 4.5 <br />Fquipenent to be used for backfilling: <br />773 has a 40 LCY capacity <br />988 has a 6 yd3 capacity <br />haul distance - 2,100 feet <br />- grade - 0 percent <br />- total resistance - 4 percent <br />Truck Costs <br />50 ton haul truck (Cat 773) <br />FYont end loader (Cat 988) <br />Cycle Time = spotting time + loading time + hauling and dump time <br />+ return tore <br />