Page 2 <br /> <br /> <br />No provisions are being made for water impoundment <br />• because all the mines of the area are dry. <br />To date the adit entryway has been driven approximately <br />350 feet with some surface facilities having been installed. <br />4lhen the surface facilities are complete, they will include <br />a shop-charge-office building, compressor building and <br />a dump. <br />Aside from the addition of ventholes to the surface and <br />any development drilling required, the applicability of a <br />mining timetable to an underground mine is questionable. <br />Most surface disturbance has been done, while ventholes will <br />be constructed within several years. Because underground <br />development of the mine does not affect the surface (eaccept <br />• for these venthole areas) and such development is highly <br />unpredictable, a timetable does not seem to be applicable. <br /> <br />