My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128574
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:42 PM
Creation date
11/25/2007 6:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977307
IBM Index Class Name
Permit File
Doc Date
9/30/1977
Doc Name
LIMITED IMPACT & SPECIAL TEN DAY PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EXHIBIT B - MINING PLAN • <br />This mine is to incorporate old mine workings and a <br />• neiv adit in such a way as to minimize new development. <br />The adit is to be driven for approximately 100 feet at , <br />a lOq~ slope and then level off for 500 feet orhere it will <br />break into an existing drift which will be refurbished <br />so that it can accommodate modern day equipment. From <br />these old workings, a drift will be driven to kno~•m ore <br />horizons. <br />All of these 8 ft, by 9 ft, development headings will <br />be advanced by incorporating conventional drill-blast <br />techniques, 1 yard loader and 5 ton buggies. Rock sup~~ort <br />will be by conventional rock bolting and timbering wherever _ <br />required. Longhole drilling :rill be conducted in the drifts <br />• as the drifts advance to4rard t'ne target areas. <br />Mining will commence as soon as the development is com- <br />plete for each stoping area. A modified room and pillar <br />stoping method will be used to mine the ore. The stoping <br />method is similar to the one presently used in the Uravan <br />Mineral Belt where ore and waste pillars are left for <br />support and a method knoYm as "split shooting" is used <br />to separate the ore from the waste. The equipment and <br />mining techniques described in the development phase <br />will be utilized in the mining phase. <br />Three ventilation holes used in conjunction with ex- <br />fisting ~rorkings vrill be needed for proper ventilation of <br />. this mine. Very little if any near power lines will be <br />needed for this mine because there are numerious lines <br />already existing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.