Laserfiche WebLink
COLOR.~DO DEP~RT`tE:lT OF HE.~LTH, Water Qualic•r Control Division <br />Renewal Permit Rationale - Paee 3. Permit No.: COG-850000. <br />II. Permit Changes (continued) '_ <br />Ocher changes: The boiler plate language in Part I. Section C., and Part <br />II. is being rz•rised to reflect the more condensed language currently <br />used in individual permits. :.-hers c`tanges were necessa^r co reflect the <br />differences betoeen general :er~it requirements and individual permit <br />requirements, such changes have also been made, <br />No ocher s'_gnificanc changes are being made co this general peraic. <br />III. Reporting <br />There have been occasions where specific permittees have not properly <br />followed the Noncompliance NociEication Reeuiremencs speci__*ied in Part <br />II.?..3, of the permit. ~.~'here a request for relief :rpm total suspended <br />solids and co cal iron and; or settleable solids limitations is desired, <br />the permittee must also submit the documentation specified under Part <br />I.B.1.d) - 3urden of Proof Re?uiremencs. Fai_ura co do so may result in <br />enforcement action and/or re•recaticn of .u.`:oriration to discharge under <br />the general permit. <br />IV. Whole Effluent Toxic icy (SET) Tast'_ng <br />Section G.9.7(2)(a)(i)(A) of the Regulations For the State Discharge , <br />Permit System o._.0 (SCCR 100<-2) exemecs facilities certified under chi, <br />general permit from 'dET testing rz?uiremencs. <br />V. .~ntidegradation <br />The discharges certified under this permit are not reviewable waters <br />pursuant co section 3.1.8(3)(a) of the Basic Standards and `fechodologies <br />for Surface Waters 3.1.0 (;CCR i002-.). <br />.ion C. Kubic <br />.ianuar;r I6, I992 <br />`1I. Public Notice Comments <br />°.'erbai Cammer.cs '.rer_ received by S?:? Region 'J.II. Their primary concern <br />related ro tae tompiiance dacz for cons °•_ct_on andior c_iaced <br />accivicies. The draft permit stet=_d chat this data was chrze years afta- <br />tae of=ecc_~re hate c[ the ;zrmit. it •aas the Di-~ision's incencon to <br />state that actain.~nent of operat_onai level would xcnr as soon as <br />possible, but in no event racer clan three years after the permit becomes <br />effective. T're final permit 'rLli ri3r1L7 tn15 t0 in6iC3te chat the <br />Di-~ision 'ai1l permit reasonable time cables for construction ~+ith <br />anerooriate tompiecion ~ac=5 but. t:e latest •iace accencabie °or <br />cpmpiacion aril: be 'une :0, :~,9`. .- _ong a nsc=•~ccion schedule ~~i'__ be <br />approved oni? _= major _onstrcct_on -~ ._?uired. °:e .~.ivision ~ai'_i '~ <br />ensur> tnac no .o nstruct wn ,cae•.r~_e _., _xcess ~^e. _~n~. <br />