Laserfiche WebLink
COLORADO DEPARTMENT OF HEALTH, S:acer Quality Control Division <br />Renewal Peraic Rationale - Page 2. Permit ;1o.: COG-350000. <br />• II. Permit Changes (continued) <br />BMP's also include treatment requirements, operating procedures, and <br />practices to control plant site runoff, spil'_age or leaks, sludge or <br />waste disposal, or drainage from raw material, intermediate and finished <br />product storage. Pollution prevention (incorporating waste minimi=acion) <br />is an essential par= of best management practices. The permictee must <br />look at all phases of the ooeracion to determine what changes could be <br />made that would result in a lower consumption and/or disposal of <br />pollution-generating materials, as well as minimising exposure of <br />pollutants to storawacer. Such efforts often result in greater profit co <br />the peraitcee and less poi'_ucion of tae environment. <br />The mechanise for implementation of stormwater BMP requirements within <br />this permit shall be the Scormwacer Management Plan (SWMP). <br />The permitcee will be required co develop and implement a S'.7MP plan. <br />Some activities required under this plan may already be in place. <br />However, the SWMP plan will require the permiccee to coordinate these <br />activities wit:t any necessary new activities in an orderly manner so chat <br />the result is the reduction or elimination of pollutants reaching state <br />waters from areas roc limited by effluent limitations. An added beaefic <br />may be a reduction of pollution reaching other media, such as the air or <br />hazardous waste disposal sites. In fact, the permictee is encouraged t.. <br />• stri':e for tale overall boat. `There the reduction of water pollution <br />only results in the •-ncrea.sed pollution o= ocher xedia, there is no net <br />benefit co the environment. <br />': he peraicczes certified under this permit shall be required to submit a <br />5(.'MP co the Division for review within si:c months from the dace the <br />certification is issued. The requirements of the plan do not specif'? toe <br />exact pollution control facilities that the permittee must construct. <br />Instead, the plan allows for creacivit;r on the permictee's part, as Long <br />as the goal is achieved. Eac'.t permictee will need to deczrmine what <br />controls era necessary at the specific site. ?'hen, the permicree wil'_ <br />need co develop a plan Eor tae timely execution of these controls. 'mere <br />construction is necessary, the plan shall include a schedule detailing <br />the milestones involved with such construction. As necessary, =_lzmencs <br />of the plan may require prior approval from the C:"L4D. <br />The plan seal: include a statement signed by top management in ':hick taev <br />affirm teat comoiiarce vita the plan shall occur. Also, __ s all orov'_de <br />Eor up daces abets there _., a change in ooeracion chat will or ma,: result <br />in a change in tae quaiiL;r of pollutants addressed by this plan, or '__ <br />tie plan _~ shown co Se inef_feccive is acaieving tae sneci_'_ad goals. <br />The plan, once submitted, will be incorporated into the permit end ice <br />implementation will be considered a permit requirement. Failure to do so <br />could resu'_t Ln enfor_zmenc ac [ion. _ne Dian shall remain _.. effect as <br />lung as tae =aciiia'r _- _aP'113tdd by c CPS permit. The per:mittee will <br />be axtected ^o .__t__'•r'on a .reari~r Sascs tnac the plan _~ ~~eing <br />implemented as required. <br />