My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128160
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:17 PM
Creation date
11/25/2007 5:44:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 06 AIR PERMITS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ~ <br />GENERAL TERMS AND CONDITIONS: IIMPDRTAfVTI READ ITEMS 5,6.7 AND el <br />1. This permit is issued in reliance upon the accuracy and completeness of information suppliedby the applicant and • <br />is conditioned upon condu;t of the activity, or construction, installation and operation of the source, in accordance <br />with this information and with representations made by the applicant or applicant's agents. It is valid only for the <br />equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and specific conditions contained in this permithave been determined <br />by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.51711a1, C.R.S. <br />3. Each and every condition of this permit is a material part hereof and is not sever~le. Any challenge to or appeal of, <br />a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be <br />deemed denied ab iniio. This permit may be revoked at any time prior to final approval by the Air Pollution Control <br />Division IAPCDI on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Contr6 <br />Commission IAQCC), including failrre to meet any express term or condition of the permit. If the Division denies a <br />permit, conditions imposed upon a permit are contested by the applicant, or the Division revokes a permit, the <br />applicant or owner or operator of a source may request a hearing before the AQCC for review of the Division's action <br />4. This permit and any required attachments must be retained and made available for inspection upon request at the <br />location set forth herein. With respect to a portable source which is moved to a new location, a copy of the <br />Relocation Notice (required by law to be submitted to the APCD whenever a portable source is relocated) should he <br />attached to this permit. The permit may be reissied to a new owner by the APCD as provided in AQCC Regulation <br />No. 3, Part B, Section III.B. upon a request for transfer of ownership and the submittal of a revised APEN and the <br />required fee. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this aaivity or operation of this <br />source. Final approval of the permit must be secured from the APCD in writingin accordance with the provisions <br />of 25-7-114.5 C.R.S. and AQCC Regulation No. 3, Fart B, Section IV.H. Final approval cannot be granted until the <br />operation or activity commences and has been verified by the APCD as conforming in all respects with the condfions <br />of the permit. If the APCD so determines, it will provide written documentation of such final approval, which does <br />constitute "final" authority to operate. Compliance with the permit conditions must be demonr0rated within 1~ days <br />sfter commencement o/ operation. • <br />6. THIS PERMfi AUTOMATICALLY EXPIRES lF you (11 do not commence construction or operation within 18 months <br />after either the date of issuance of this permit or the date on which such construction or activity was scheduled to <br />commence as sat forth in the permit, whichever is later; (21 discontinue construction for a period of 18 months or <br />more; or 13) do not complete construction within a reasonable time of the estimated completion date. Extensions <br />of the expiration date may be granted by the APCD upon a showing of good cause by the permittee. <br />7. YOU MUST notify the APCD et )coat thirty days (fifteen days for portable sourceal pdor to commencement of the <br />permitted operation or activity. Failure to do so is a violation of Section 25-7-114.511211a1, C.R.S. and AQCC <br />Regulation No. 3, Part B, Section 1V.H.1 ., and can result in the revocation of the permit. You must demonstrate <br />compliance with the permit conditions within 180 days oiler commencement at operation as stated in condition 5. <br />8. Section 25-7-114.7(2), C.R.S. requires that all sources required tofile an Air Pollution Emission Notice (APEN) must <br />pay en annual fee to cover the costs of inspections and administration. If a source or activity is to be discontinued, <br />the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, annual fee <br />billing will terminate. <br />9. Violation of the terms of a permit or of the provisions of the Colorado Air Quality Control Act or the regulations of <br />the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-1151anforcament), <br />-121 (injunctions), -122 (civil penalties!. -122-1 (criminal penalties), G.R.S. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.