Laserfiche WebLink
<br />MINING PLAN <br />I' <br />I' <br />I' <br />I' <br />I <br />I <br />~J <br />1 <br />The cevelopment of this site will be in three separate phases as depicted on the <br />Mining Plan Map. <br />The overburden on Phase I will be removed and will be utilized to construct an <br />earthen berm in the north-east corner of the site. This berm is a requirement <br />of our Mesa County Permit and will serve as a sound and visual barrier for the <br />propE~rty that is adjacent. <br />The area in Phase 2 and 3 will be used as process and stockpile areas while <br />operations are conducted in Phase 1. <br />Operations will proceed then to the west <br />3. As the operations move to the west, <br />and stockpile areas. <br />into Phase 2 and subsequently into Phase <br />the pit floor will be used as process <br />Our intent is to situate processing equipment as far to the south as is feasible. <br />It i<_ anticipated that there will be considerable quantities of overburden to <br />be dealt with. Some of this overburden will be useable as a topsoil and will <br />be utilized in the rehabilitation of the site. This soil can be placed in a berm <br />on the north side of the property. The soil can be placed in along, low windrow <br />for future use. <br />A 100' greenbelt area will be left on the south property line, adjacent to the <br />Colorado River. This area is to be used as a public trail under the jurisdiction <br />of Mesa County and the Colorado Riverfront Commission. <br />As depicted on the Mine Plan Map there are four easements that influence the size <br />and shape of the lake. <br />The operations at this site shall include mining of sand and gravel, crushing <br />and processing sand and gravel and the use of the processed aggregates in the <br />production of Hot Bituminous Asphalt and/or Ready Mixed Concrete. <br />Access onto the site will be off C 1/2 Road to the north. <br />' It will be necessary to maintain a dewatered condition during certain phases of <br />operations. A Colorado Department of Health NPDES Permit shall be obtained for <br />this purpose. Dewatering will be performed in a safe and responsible manner. <br />' The method of mining/processing will be that insitu material will be processed. <br />This necessitates the placement of the crusher plant relatively close to the pit <br />t run in each phase. The crushed material will then be conveyed to the stockpile <br />area for storage. <br />As previously discussed, the overburden in Phase 1 will be removed and will be <br />' used in the berms that were mentioned. <br />The overburden in Phase 2 will be used to slope the banks and to create varying <br />' degrees of water depth in Phase 1. <br />1 <br /> <br />