Laserfiche WebLink
6.3.4 F?~?IHTT ~- Reclamation Plan <br />(a) when the pit is exhausted, the overburden will be replaced. <br />(b) The mt3xi.rnun gradient of the reclaimed slopes will be ten to one. <br />(c) 'T'he primazy measure that will be taken to revegetate the site will be <br />the planting of Turkey Red Winter Wheat, consistent with the balance <br />of the surrounding farm land. <br />(i) wheat will be planted at a rate of thirty pourds per acre. <br />Roil analysis is included in Soil Conservation infarnation. <br />(ii) The site will he seeded during the reclamation phase when the <br />pit is exhausted. The seedbed will be chiselled. No ferti- <br />lizers will be employed. <br />(iii) None, see (i) above. <br />(iv) Non- applicable, see (i) above. <br />(v) Non-applicable <br />(vi) PIO shrubs or trees will be planted. <br />(d) None existing, or in plan. <br />(e) Nofle irrvolved •.' <br />(f) A written estimate of the actual costs to reclaim the site is attached. <br />?7ie quote is fmn B & T ESccavating of Wellington, Colorado. Back- <br />fillinq, grading and topsoil application will be done by B ~ T F3cca- <br />vating. Seeding and labor to canplete reclamation will be done by <br />Doyle Russell, applicant. The total reclanation cost of $5,139 is <br />broken down into: <br />-backfilling-$1,285 <br />-gradinq~1,285 <br />-topsoil application-51,285 <br />-labor--$1,285 <br />The paint of maximan disturbance shall be reached when th pit encan- <br />passes the entire six ages permitted. The cost per cubic yard for <br />grading is fifty Dents. FYnish grading of subsoil is 12.5fi a yaLd, <br />topsoil application cost is 12.5fi per yard. Fertilizer and mulch will <br />not be utilized. Cost of Turkey Red Winter Wheat seed per acre is <br />approximately $3,50 per acre. <br />(2) All Fquignent costs, operator wages am] benefits, fuel and lubricant <br />consuma~tion and depreciation are included in the irrlependent contractors <br />estimate. Mobilization and demobilization of ezuipne~t are also in- <br />cluded in the bid. <br />(3) All itais referenced in the reclamation plan are included in the . <br />cast calculation. <br />