Laserfiche WebLink
<br />• <br />and shall be pushed downhill into the previous cute after the coal <br />has been removed. <br />Following overburden removal, the coal will be ripped and <br />pushed by dozers to the down-dip eztent of the pit where it will be <br />loaded into H-170 haultrucka by a front-end loader for transport to <br />the temporary stockpile area. Backfilling and grading will be <br />performed by the overburden removal dozers during the normal course <br />of operations. Scrapers will then be used for topsoil replacement <br />prior to the initiation of revegetation procedures. <br />The is-place tonnage of coal is 193,000 tone, with the <br />recoverable coal at 90Z recovery, equal to 174,000 tone. <br />With a two year life, annual production is estimated to be <br />87,000 tone/yeaz. <br />The major surface equipment to be used at Colorado Yampa Coale <br />Mine No. 3 is as follows: <br />OVBHBO@DBH BSMOVAL <br /> <br />SQOIPMBNT TYPH QHAN'PITY <br />1. Loader Letourneau L-800 1 <br />2. Haaltruck Euclid R-170 3 <br />3. Dozer Caterpillar D-9 2 <br />4. Grader Caterpillar 16G 1 <br />2.05 - 4 <br />