Laserfiche WebLink
Revised April, 1984 <br />• <br />Stream Diversions <br />No diversion of intermittent or perennial streams or of ephemeral <br />streams draining one square mile or more is planned within the <br />proposed permit area. As indicated on Map 4, Mine No. 3 Hydrology, <br />the stream channels of Foidel, Middle and Fish Creek will be <br />maintained in their present positions. Therefore, performance <br />standards for stream channel diversions are not applicable. <br />CS) Topsoil. A narrative explanning the method of removal sad the <br />amount to be removed and the plan for storage of topsoil, subsoil, and <br />other material within the permit area subject to requirements of the <br />topsoil removal performance standards of 4.06.2. This narrative shall <br />• specify the depth of material to be salvaged from all disturbed areas based <br />on the soil information required by 2.04.9 and shall specify the volume of <br />each type of material to be salvaged. A map of any proposed storage <br />structures shall accompany the narrative. The maps shall be prepared <br />according to the requirements of 2.10. <br />RESPONSE: <br />Scrapers will remove topsoil from a 5.3 acre area between the <br />portal pit and County Road 179 prior to the regrading activity in that <br />area. A total of 12,800 cubic yards of topsoil will be stripped in a <br />• single 18 inch lift with scrapers. Since the topsoil will be <br />immediately redistributed in Area 2, no topsoil storage will be <br />2.05-25a <br />