My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127716
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:51 PM
Creation date
11/25/2007 5:08:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Appendix 3.7-2 Water Depletion -Section 7 Consultation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bald eagle in accordance with Section 7(a)(1) of the Endangered Species Act. <br />We concur with the finding in your biological assessment of "no effect" for <br />r ~ <br />~J <br />the peregrine falcon (Falco perettrinus). <br /> <br /> <br />C~ <br />Proiect Description <br />The project site is located along a mountain feature known as the Grand <br />Hogback near New Castle, Garfield County, Colorado (Figure 1}. Surface <br />facilities are located primarily on hilly and benched lands above the <br />Colorado River flood plain on the ^orth side of the Grand Hogback. Grazing <br />is the predominant land use of the site <br />Extensive coal mining has occurred <br />on the site and throughout the area. <br />The SHM will be an underground.operation utilizing hydraulic mining to <br />produce approximately 2,200,000 tons of coal{year. Approximately 3,750 <br />acres of federal and private land will be required for the mine and <br />associated facilities. The mine will be opened by the construction of two <br />parallel tunnels approximately 2,500 feet in length. Primary surface <br />facilities will include water handling and clarification equipment, coal <br />washing, and rail loadout. Auxillary facilities include offices, shops, <br />electrical distribution, water and sewage treatment. The rail loadout will <br />be approximately 4 miles long and located primarily on existing railroad <br />bed. A high capacity conveyor will move the coal to a unit train loading <br />station. Principal vehicular access for the project will be via the dual <br />purpose main access haul road. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.