Permit No
M2002009
IBM Index Class Name
Permit File
Doc Date
3/29/2002
Doc Name
Adequacy Review Comments
From
Lafarge
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3H:1 V. As the mining progresses, topsoil will be replaced through out the finished phases and <br />reseeded. It is the understanding of the Division that based on the quantity of topsoil provided <br />under Exhibit "L" (16,000 LCY) an average of 6 inches of top soil will be spread through out the <br />permit azea. <br />EXHIBITS "F" THROUGH "K" (6.4.6 THROUGH 6.4.11) ADEQUATE <br />EXHIBIT "L" RECLAMATION COSTS 6.4.12 <br />1) On page 14 of 23, the operator under back slopping, states it will be accomplished during <br />mining so no cost associated with that part of the reclamation task was calculated. However, on <br />page 4 of 23, under mining plan, the operator states," If a certain volume of overburden is not <br />used as base course, the remaining overburden will be used to flatten slopes to less than 3:1. On <br />the same page, the operator states" The mining face will be nearly vertical <br />I/z :1 slope. Unless you are proposing to leave the mining face at the end of each mining day at a <br />3:1 slope, the Division needs to calculate the amount of material the would need to be pushed to <br />get the slope from the'/z to 1 mining face to 3:1 reclamation slope. Please explain, or provide the <br />maximum length, and height of the mining face so the Division can calculate the needed <br />reclamation warranty. <br />2) Under the same page, the operator states, "The front end loaders will excavate the material <br />and deposit it on conveyors. How long is this conveyor system ?How come the cost of removing <br />the conveyor system not included under the Exhibit, please explain and provide the needed <br />information so the Division can calculate the cost of reclamation. <br />EXHIBIT "M THROUGH "R" (6.4.13 THROUGH 6.4.18) ADEQUATE <br />EXHIBIT "S' PERMANENT MAN MADE STRUCTURES (6.4.19) <br />1) Please refer to comments under EXHIBTI' "C" <br />The decision date for the application is 5-21-02, in order to allow the Division adequate time to <br />review your response, please submit your response as soon as possible. <br />Sincerely, <br />Berhan Keffelew <br />Reclamation Specialist <br />CC: James Stevens <br />