Laserfiche WebLink
Page 5 <br />Immediately beneath the ore ~iQrizon are interbedded <br />• mudstone and shale units which ultimately (30-35 feet.) <br />grade into the Second~:Rim Sandstone of the Salt 1Vash Member, <br />The applicability o~ a timetable to an underground <br />operation is questionable. <br />The area to be vrorked at any one time will not appreciably <br />increase after the initial distuubance around the portal area, <br />Small amounts of additional acreage may be involved as the <br />waste dump gro~•~s or additional roads for ventholes and develop- <br />ment drilling are needed. All ventholes will be constructed <br />orithin five years. This land has been accounted for in the <br />affected acreage. <br />Areas involved that may be classified as major disturbance <br />include only the waste dump, Tdoderate disturbances include <br />the area required for stabilization of the ~~raste dump and <br />grading of the areas used for parking, structures, and <br />storage of equipment and other materials. There are no <br />minor disturbances as defined in the regulations. <br /> <br />