My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127576
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:42 PM
Creation date
11/25/2007 4:55:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/6/2005
Doc Name
Annual Operating Plan 2005 Methane Drainage Project Panels 16-24
Section_Exhibit Name
Exhibit 80 Drilling Activities - MR306
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
representative for inspection. Any proposed changes in the Annual Operating Plan will be <br />reviewed and approved with the appropriate regulatory agencies before changes take <br />effect. <br />In accordance with the Conditions of Approval, Administrative #2, the staging areas to be <br />used by the drilling contractor will be reviewed with and approved by the USFS District <br />Ranger or designated representative prior to use. These sites will be used in a manner to <br />minimize damage to the vegetation and soil. Any surface disturbance to these sites will be <br />re-graded and seeded to facilitate rehabilitation. <br />Access to all drill sites will use the roads and trails approved in the Decision Notice. <br />All access routes will be maintained to accommodate 4X4 pickup trucks and a drilling <br />unit. A drilling unit is comprised of or part of the following equipment: truck mounted or <br />skid mounted drill rig, air compressors, air boosters, rig-up truck, boom truck, utility trailers, <br />fuel skidders, drill pipe lay-down rack, crew trucks, and water trucks. <br />ROAD CONSTRUCTION <br />MCC will construct five temporary spur roads in 2005. These roads are Box Canyon Road, <br />19-01/03 Spur, 19-04/05 Spur, 20-O1 a Spur and 24-08 Spur <br />Road Name Length Access to <br />19-01/03 Spur .04mi 19-06 <br />19-04/05 Spur .04mi 19-04,05 <br />ZO-O1 a Spur .04mi 20-01 a <br />24-08 Spur 0.3 mi. 24-08 <br />The projected locations of temporary roads and drill pads are provided on Map 2. MCC will <br />identify and mark the road alignments and pad locations prior to construction for review and <br />approval by the responsible USFS representative. <br />MCC will construct or install the temporary roads, drainage features, road surfacing, <br />MUTCD signs, gates, and other mitigation measures as defined in the field with the <br />responsible USFS representative. <br />MCC will reconstruct one previously used temporary road for use in the 2005 <br />drilling. This road will be the West Flatiron Extension to access 20-01 a, 19-01,19-02, 19- <br />03,19-04, and 19-05. The road was previously used to access RAV 5 in August of 1993, <br />
The URL can be used to link to this page
Your browser does not support the video tag.