Laserfiche WebLink
6.4.5 Exhibit E -Reclamation Plan <br />Table 6.4.5-2. Reclamation Earthwork <br />CELL RECLAMATION AREA APPROXIMATE SEQUENCE <br /> ACTIVITY VOLUME [yd3] <br />A Backfill with -2.4 ac -55,000 Following mining of <br /> stockpiled and in- Cell A <br /> situ overburden <br /> located in Cell B <br />B Backfill slopes (3:1) -17,000 Following mining of <br /> with stockpiled Cell B <br /> overburden located <br /> in Cell A <br />A and B Replace Topsoil to -2.65 ac -6,400 Following backfilling <br /> a depth of 1.5 ft and slope grading of <br /> Cell B <br />A and B Disk and Plant -2.65 ac _ Following topsoil <br /> Native seed Mix replacement in Cells <br /> A and B <br />C Backfill with -6.4 --217,000 Following mining of_ <br /> stockpiled and in- Cell C <br /> situ overburden <br /> located in Cell D <br />D Moisture condition -33,000 Following mining of <br /> in situ shale located Cell D <br /> in pit floor of Cell D <br />D Scrape moisture -33,000 Following moisture <br /> conditioned shale conditioning of shale <br /> located in pit floor of <br /> Cell D and place <br /> and compact <br /> around perimeter of <br /> Cell D <br />D Backfill construction -45,000 Following <br /> dewatering gap and construction of Clay <br /> slopes to 3:1 Liner <br />C and D Replace Topsoil to -17.5 ac -42,000 Following Backfilling <br /> a depth of 1.5 ft slopes and <br /> Dewatering Gap <br />C and D Disk and Plant -17.5 ac Following Topsoil <br /> Native seed Mix Replacement <br />Garde/s Pit <br />Regular 112 Permit Application <br />