Laserfiche WebLink
`i <br />SUMMARY OF GVB 14 - 04 <br />~.~ _~ <br />DATE ACTIVITY/EVENT NOTES <br />8/2/2001 Finish settin u on site. Drilled down and set surface casin .Drilled 190 feet, hole at 190'. Drillin with 15" hammer bit. <br />8/3/2001 Drilled 120 feet, hole at 310'. Tri ed out to re are for directional motor. Directional motor on site, missin subs. Did odd 'obs on site. <br />8/412001 Did odd 'obs until sub arrived. Drilled 145 feet, hole at 455 feet. Pin and Pin sub arrives about 1:30 PM <br />8/512001 Drilled 260 feet, hole at 715', Tri ed out to increase de ree of motor. Usin 14 3/4 tricone bit. <br />8/612001 Drilled 530 feet, hole at 1245'. <br />817/2001 Drilled 460 feet, hole at 1725'. <br />8/6/2001 Drilled 290 feet, hole at 2015' TD for casin . Tri out and re are to run casin . <br />8/9/2001 Ran 1963.75' of 10 3/4" casin down hole. Start um in cement to set casin . <br />8110/2001 Finish cementin hole. Clean cement from 1673' to 2015'. Drill from 2015' to 2230'. Usin 9 718 hammer bit. <br />8/11/2001 Drill 27 feet, hole at 2257'. Run and set 328.66' of casin 206.96 slotted . Start tearin down ri to move back to GVB 14 - 05. <br /> <br />