Laserfiche WebLink
TO THE PUMP <br />INITIAL INCLINATION J <br />AT 34,16' <br />X <br />X <br />Division of Minerals and Geology <br />TOP OF TREMIE AT 300' <br />10 3/4' J-55 40.5#/FT <br />CARBON STEEL CASING <br />THREADED AND COUPLED <br />IDS 10,050'; COUPLER OD; 11,75' <br />VALVE <br />SURFACE ELEVATION <br />8560' <br />X\X, ~ 0; OFR16'C ^.D.OCAS NG H RECEIVE® <br />N;a~ ~ a zoe? <br />CEMENT GROUT <br />15' HOLE DRILLED T^ 1601' <br />N ~ T E ~ pIPE IN THE HIOLE <br />BOTTOM OF 10 3/4' CASING <br />AT 1601' <br />7/8' HOLE DRILLED T^ 2438' <br />7 5/B' STEEL CASING J-55 26#/FT <br />IDS 6.969'; COUPLER ^D~ 8.50' <br />56.32' ^F 'FISHING' <br />TOOLS AT 2375' <br />HOLE ABANDONED 240' <br />ABOVE B-SEAM AT <br />ELEV. 6520' <br />7,89' ^F DIRECTIONAL MOTOR ^N <br />THE BOTTOM OF THE HOLE (2438' <br />/ \j(~~JjffA((1~ CCIA(, N£Si EIK NINE <br />/~iDCO~~ LLG P.6 WY 101 !1 ]~ N~% 111 <br />MORT, fA /14N <br />CVB - !0 - 03 AS BUILT <br />one xrs ]-l,rttm <br />