Laserfiche WebLink
• The Settling Cell is sized to hold all the calculated sludge for the projected 10-year mine <br />life. Removal of sludge may not be required until the end of the mine life unless there is <br />an increase in the average flow rate or solids content in the influent. Precipitation of <br />solids in the Polishing Cell will prompt an analysis of the Settling Pond performance, <br />• <br /> <br />10 <br />