My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127320
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:26 PM
Creation date
11/25/2007 4:33:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Permit File
Doc Date
7/30/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- ~ !~ <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - WHEEL LOADER WORK <br />Task #: 6 <br />______ <br />__ Prep. by: RCO Task filename M285-6 <br />_-__ <br />Date 07/30/97 <br />Permit ___--___- <br />#:M-77-285 __---_--___ <br />Mine: Sunday Mine <br />Permitting action Final Reclamation <br /> <br />Task description ______ <br />Spread _______________ <br />Topsoil on 3.1 ____________________________ <br />Acres (amendment area 1983) <br />HOURLY EQUIPMENT LOST <br />Lost Breakdown - Ownership = 827.72 <br />-------------- - Operating-loader = 523.66 <br />- operator = 522.95 <br />Sheet 1 of 2 <br />(199 Horsepower = 220 <br />Shift basis: l/day <br />(D01 OSO) <br />Basic machine: CAT 966E <br />Attachment #1: ROPS Cab <br />100 :G utilization <br />- Total cost/hr = 574.33 Total fleet cost/hr = 574,33 <br />MATERIAL OUANT (TIES <br />___________________ <br />___________________ <br />Initial Swell Final <br />volume = 2,500.0 CCY factor = 1.125 volume = 2,812.5 LCY <br />Quantity source/reference Calculation from Map, Insp. <br />_____________________________________________ <br />(G Swell source/reference program <br />HWRLY PRODUCTION <br />_________________ <br />_________________ <br />Loader Cycle Time <br />Unadjusted Basic Cycle Time (load, dump 8 maneuver) = 0.525 min <br />(CHB l1SA)--- <br />Cycle Time Factors: Factor (min.) <br />Material- Mixed material 0. 020 (CHB IbA) <br />Pile- No adjustment - factor not applicable 0. 000 (CHB fbA) <br />Truck Ownership- No adjustment - factor no[ applicable 0. 000 (CNB IAA) <br />Operation- Constant operation -0. 040 (CHB IbA) <br />Target- Nominal target 0. 000 (CHB 1bA) <br /> Net Cycle Time Adj.= -0. 020 min. <br /> Adj. Basic Cycle Time = 0. 505 min. <br />
The URL can be used to link to this page
Your browser does not support the video tag.