My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127320
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:26 PM
Creation date
11/25/2007 4:33:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Permit File
Doc Date
7/30/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i • <br />HOURLY PRODUCTION cont'd Sheet 2 of 2 <br />Loader Cycle Time cont'd <br />Rolling Resistance <br />__________________ <br />Roadway underfootin9 conditions: <br />Haul :Dirt or lt. surfaced- firm, rolling, mai nt'd <br />Ret urn:Dirt or lt. <br />____________ surfaced- <br />___ firm, rolling, maint'd <br /> _______ _____________________ <br />Grade Rolling ________ <br />Total <br />Travel <br /> Length Resist. Resist. Resist. Time <br />Naul 8 return Time: (ft) (%) (%) (%) (min.) <br />Haul Route: 200 0.00 3.00 3.00 0.202 (CHB >~U'h) <br />Return Route: 200 0.00 3.00 3.00 0.182 (CHB »ll'h) <br /> Total travel time = 0.383 <br /> Total cycle time = 1.008 minutes <br />Loader Bucket Capacity <br />______________________ <br />Rated Capacity= 4.50 LCY (heaped) <br />Bucket fill factor= 0.875 Loose mat.- 1" and over diameter (85 - 90%) <br />Adjusted rapacity= 3.94 LCY <br />Job Condition Correction Factors <br />Site altitude = 5,750 ft. <br />Altitude correction factor = 1.00 (CHB D80) <br />Job efficiency factor = 0.83 (1sh/day) <br />Net Correction = 0.83 multiplier <br />Unadjusted Hourly Unit Production 234.27 LCY/Hr <br />Adjusted Hourly Unit Production 194.45 LCY/Hr <br />Adjusted Hourly Fleet Production 194.45 LCY/Hr <br />JOB COST <br />Fleet size = 1 Loader(s) Total job time = 9.66 Hours <br /> <br />Unit cost _______ <br />= SD.382 /LCY <br />Total ___________ <br />job cost = 8718.18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.