• Production. The following shows the anticipated production by year for the <br />life of the permit: <br />Year Tonnage* <br />49,000 <br />2 49,000 <br />3 49,000 <br />4 49,000 <br />5 49,000 <br />6 49,000 <br />7 49,000 <br />8 49,000 <br />9 49,000 <br />10 49,000 <br />I I 49,000 <br />12 49,000 <br />13 49,000 <br />14 49,000 <br />15 49,000 <br />16 49,000 <br />17 49,000 <br />18 49,000 <br />19 49,000 <br />• 20 <br />2 I 49,000 <br />49,000 <br />22 49,000 <br />23 49,000 <br />24 49,000 <br />25 49,000 <br />26 49,000 <br />27 49,000 <br />28 49,000 <br />29 49,000 <br />30 49,000 <br />3 I 49,000 <br />* Tonnage based on an estimated 2,700 pounds per cubic yard. <br />BACKFILLING AND GRADING. <br />Upon completion of gravel removal from an area, backfilling and grading can <br />commence. The material to fill the open pit will be moved by scrapers from <br />the next adjacent pit being worked or from the overburden stockpile. The <br />scrapers and dozers will compact the material by their weight which will <br />• ensure stability. <br />D-4 <br />