Laserfiche WebLink
• <br />RECLAMATION COST SUMMARY con['d sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (S) <br />Subtotal (K): <br />____________ <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (L ): <br />N. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (f) <br />~ ~ <br />~ Demolition ~ <br />588 ~ Seeding ~ l5, 438 <br />Fencing <br />9 ~ Mob/Demob ~ f1,619 <br />Subtotal (M): 57,057 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 51,052,440 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item Mo.~ Item Description <br />____..._I_________________________________ <br />1. ~ Public Liability Insurance.... <br />2. ~ Contractor's Performance Dord <br />3. ~ Contractor's Profit........... <br />4. ~ Job Superintendent.. <br />~ Cost (f) <br />1.550% of dir. ~ f16,313 <br />1.550% of dir. ~ 516,313 <br />10.00% of dir. ~ 2105,244 <br />Subtotal (A ): 5137,870 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 51,190,310 <br />8. DNG PROJECT ADMINI STRATTON E%PENSES <br />Item No.~ Item Description ~ Cost (S) <br />________I__________________________________________________~___________ <br />1. ~ Minerals Program Adm S.OOX of cntr.~ 559,515 <br />NET INDIRECT LOST PERCENTAGE: 18.76% Subtotal (8 ): f59,515 <br />____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through 8): f197,385 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f1, 249, 825 <br />